Posted on September 17, 2020 by site

A ground breaking ceremony was held Sept. 11 as the city of Zebulon completed their portion of the sewer and water lines for the VA Clinic which is expected to be completed by the end of 2021. City and county leaders gathered with representatives from contractors and others involved in the construction and utility expansion process.

“This is a big deal for the city and the county and veterans in surrounding communities who will come here for the services they need,” said Zebulon mayor Joe Walter.

Read the full article.

Posted on February 8, 2020 by site

Las Vegas (January 21, 2020) — The Harrison won a 2019 Multifamily Pillars of the Industry Award for Best Mid-Rise Apartment Community (6 to 9 stories) from the National Association of Home Builders. Developed by Las Vegas-based The Molasky Group of Companies, The Harrison is located in Glendale, California, and offers 164 studio, one-bedroom and two-bedroom modern apartments. The Harrison features spacious apartments with designer-selected finishes, tech conveniences, and stainless steel appliances. Playful amenities include a resort-style pool, rooftop deck, high-quality fitness center, a dog run, EV charging stations and a CVS offering convenient retail on the ground floor. The architect for the award-winning property is Humphreys & Partners, and Greystar is property management. more information visit https://www.harrisonglendale.com/

Posted on June 28, 2019 by site

$56.3 Million Project Scheduled To Be Completed By January 2021

Mayor Carolyn G. Goodman, Councilman Bob Coffin, Municipal Court Chief Judge Cynthia Leung, Molasky Group President and Chief Operating Officer Rich Worthington and other officials officially broke ground on a new Municipal Courthouse in downtown Las Vegas at 9:30 a.m. on Tuesday, June 25.

The new $56.3 million building will be located at 100 E. Clark Ave. and is being developed by the Molasky Group of Companies. Joining the Molasky Group on the project are Martin Harris Construction as general contractor, PGAL as lead architect, Walter P. Moore as structural engineer, MSA Engineering and GCW Engineering. 

When complete in January 2021 the new four-story facility will house the city’s Municipal Court functions including traffic court, court administration and courtrooms for the six Municipal Court judges. It will also house the Municipal Court Administration and portions of the City Attorney’s Office

Posted on March 6, 2019 by site

Seattle – International partners Binjiang Real Estate Group and Molasky Group of Companies celebrated the grand opening of Arrivé Seattle and The Sound Hotel at a ribbon cutting ceremony on February 26, 2019. Special guests included former Washington Governor Gary Locke, who also served as Ambassador to China and Jenna Hackett, Global Brand Head for Tapestry Collection by Hilton.

The 43-story tower is the newest for-rent mixed-use property in the market and blends exceptional apartment living with 344 high-end luxury units, The Sound Hotel offering 142 trendy hotel rooms, and Instagram-able food and drink options at Currant Bistro.

“Every aspect of Arrivé is designed and constructed with intentionality and thoughtfulness toward our customers,” says Mike Doran, project executive for The Molasky Group, the development partner with Binjiang Real Estate Group. “The construction team worked tirelessly to bring this asset online in 27 months, and the project partners worked in conjunction to bring an outstanding blend of apartment units, hotel rooms, and amenities to market. From its seven levels of subterranean parking to the breathtaking views at the penthouse units and roof-top amenity, Arrivé has a lot to offer people who want to live or lodge in downtown Seattle.”

Designed to be a vibrant property, The Sound Hotel shares an active lobby with Arrivé and celebrates the sights, sounds, and tastes that are unique to Seattle. Its 142 exquisitely designed, well-appointed guest rooms occupy the first ten floors of the building, some offering expansive views. The hotel features the ground level restaurant Currant Bistro and a full-service, grab & go coffee bar. For meetings, the hotel’s 7th Floor offers the Lupine Room: 770 square feet of divisible meeting space ideal for groups of up to 50, as well as Sound Bite Lounge, a relaxed, post-meeting gathering spot with seasonal outdoor seating and unobstructed views of the Space Needle. The Sound Hotel is the first Tapestry by Hilton in the state of Washington for Hilton Hotels and Resorts and will be managed by The Hotel Group, a leading national hotel management and investment company.

“We think that the warm, rich textures and theming in the rooms and amenities offers guests an authentic vibe reminiscent of Belltown’s musical roots,” says David Watkins, general manager for The Sound Hotel.

The top thirty-one floors of the building feature 344 apartments with a range of floor plans from studios to three bedroom/three bath units professionally managed and operated by Seattle-based Blanton Turner. All apartments have large windows showcasing Seattle’s cityscape and natural beauty with many, especially the penthouses, offering spectacular views of Elliot Bay and Lake Union.

Understated elegance defines Arrivé where residents can select from two designer-finish palettes to complement their personal style and décor. Each thoughtfully-designed residence includes air conditioning, quartz surfaces, modern kitchens with professional appliances and gas ranges. Select units include private terraces, walk-in closets, under-cabinet lighting and French-door refrigerators with PureAir filtration systems. Penthouse units have exclusive color palettes and include waterfall islands, Miele appliances, and cabinets by California Closets. Lighting, thermostats, and window treatments are controlled from a smartphone with instant connectivity to Z-Wave technology. All residents can take advantage of community spaces to host private gatherings or enjoy a glass of wine with friends on the spacious rooftop lounge with indoor/outdoor kitchen and bar. Energy efficient lighting is used throughout the building, which is targeting LEED Silver certification.

Arrivé was developed by China-based Binjiang Real Estate Group and Las Vegas-based The Molasky Group of Companies. The general contractor is Denver, CO-based PCL, the sixth largest contractor in the United States. The architect is Weber Thompson, Seattle’s most notable architectural firm. The Los Angeles office of Hirsch Bedner Associates (HBA), the world leader in interior design, created the signature décor at Arrivé.

For more information on living at Arrivé go to www.arriveseattle.com. To book a hotel room, visit https://tapestrycollection3.hilton.com/tc/sound-hotel-seattle/

Posted on February 7, 2019 by site

PR Newswire

SEATTLE, Feb. 7, 2019

SEATTLE, Feb. 7, 2019/PRNewswire/ — A new landmark along Seattle’s cityscape is the latest destination to live, lodge and dine in downtown Seattle. The 43-story Arrive’ tower is the newest for-rent mixed-use property in the market and blends exceptional apartment living with 344 high-end luxury units, The Sound Hotel and Instagram-able food and drink options at Currant Bistro and Caffe Umbria.

Read the full article here.

Posted on October 4, 2018 by site

The Molasky Group Partners With City of Las Vegas To Develop Municipal Courthouse

LAS VEGAS  – The city council approved a development agreement with The Molasky Group of Companies to develop the City of Las Vegas Municipal Courthouse in the civic corridor of downtown Las Vegas.

The four-story, 139,431 sq. ft. development will be located on approximately one acre at the SW corner of Clark Avenue and 1st Street. Sited to the southeast of the Las Vegas City Hall, the Municipal Courthouse is designed to complement City Hall while starting to create a complex of City facilities. The site is located near the City parking garage, the Detention Center, and the Regional Justice Center. The Courthouse is designed to meet LEED Silver level requirements and will be built for approximately $56.3M.

Joining The Molasky Group on the development team are: Martin Harris Construction as general contractor, PGAL as lead architect, X-9 Design Group as design architects, Walter P. Moore as structural engineer, MS Engineering for MEP and ITS, and GCW Engineering as civil engineers.

“It is exciting that a new courthouse is coming to the government corridor in downtown Las Vegas,” Mayor Carolyn G. Goodman said. “The Molasky Group has been a longtime private-sector partner and we look forward to having a first-class Municipal Courthouse to serve the people of Las Vegas.”

“It is an honor for the Molasky Group and our development team to partner with the City of Las Vegas to build the new municipal courthouse,’ says Rich Worthington, president and chief operating officer. “The City has longed for a courthouse and we plan on providing municipal judges, staff and city residents with a state of the art facility where justice can be served proudly.”

The four-story facility will house the City’s Municipal Court functions including Traffic Court, six additional Courtrooms, City Attorney’s office, customer service, court administration, classrooms and public space.  Included in a sub-basement level will be secure parking and a sally port for prisoner transportation.

Construction is scheduled to commence around August 2019 and will bring more than 150 construction jobs to downtown Las Vegas. The project will be complete by January 2021.

“The new Municipal Court project is just another example of the exciting things happening in the downtown,” said City Manager Scott Adams. “It’s why many are calling this a time where downtown lights up!”

“This is opportunity to have a more efficiently designed facility that will allow our Municipal Court to better serve the current and future needs of the citizens of the city of Las Vegas,” said Municipal Court Administrator Dana Hlavac. “The close proximity to the Regional Justice Center and the Supreme Court building will allow for a continued strong level of cooperation and communication among all levels of the judiciary.”

For Irwin Molasky, founder and chairman of the Molasky Group, the new municipal courthouse is a very special project that intertwines with a lifetime love and respect for the Rule of Law. He is a founder of Project REAL (Real Education About the Law), a non-profit organization that has educated nearly 40,000 schoolchildren on democracy and their rights; he served on the board of directors for the National Judicial College and has been honored by the Nevada Supreme Court for his knowledge and love of the law.

About the Molasky Group

The Molasky Group of Companies is one of the most prolific real estate development and property management companies in the United States. For 67 years, the company has created an impressive and highly marketable portfolio of office, commercial, multi-family, retail, healthcare, aviation, law-enforcement and correctional properties. The Molasky Group has significant experience with Public-Private Partnerships on large-scale build-to-suit projects for federal, state and local agencies, having successfully completed more than $2.0B of new construction. And, it is a market leader in sustainable construction building seven LEED Gold, three LEED Silver and two LEED Certified large scale properties across the United States. The Molasky Group is based in Southern Nevada and has offices in Atlanta, Georgia and Portland, Oregon. For more information visit https://molaskyco.com/

Posted on September 17, 2018 by site

After years of waiting, the 30,000 military veterans in Columbus and the surrounding Chattahoochee Valley area are finally getting a new primary care and mental health clinic as part of a $62.4 million project, the U.S. Department of Veterans Affairs said Thursday.

Construction on the 55,000-square-foot outpatient clinic at 2357 Warm Springs Road is scheduled to begin in early 2019, with an estimated completion date in spring 2021.

That address is the 12-acre site of the former Blue Cross and Blue Shield of Georgia office, which was closed after the insurance company relocated its Columbus operations center to Muscogee Technology Park on the northeast side of the city in late 2015. That construction project was valued at $76 million.

VA said that PH LLC, doing business as Molasky Group of Companies Inc., based in Las Vegas, Nev., has been awarded the $62.4 million contract to develop the Columbus outpatient clinic. Blue Cross turned the nearly six-decade-old Warm Springs Road property over to the company after moving into its new state-of-the-art office.

Just as Blue Cross is leasing its current 235,000-square-foot building from Molasky Group long term, Veterans Affairs will be doing so as well over 20 years with the Las Vegas development firm, the agency said.

Read the Full Article Here

Recent Posts